QUESTION:
I am engaged in preparation compost for mushrooms, for sterilization I apply camera, temperature of 50-70 degrees. In the winter work is, and is not present in the summer. Whether I for drying foam concrete of pairs, if yes, at what temperature can use, and what period of time sufficient for dredging from forms?
THE ANSWER:
For manufacturefoam concrete it is impossible to use pairs, as against gas concrete. Only warm air.

QUESTION:
And how to take out, say, to Novgorod? Problems with border any?
THE ANSWER:
Problems with export any. All is solved when due hereunder according to the customs legislation of Ukraine and Russia.

QUESTION:
Whether probably from you to get drawings on foam generator to foam concrete to installation?
THE ANSWER:
Drawings on foam generator to foam concrete to installation to get it is possible

QUESTION:
I would like to start at myself in the city of Cherkassy pass a factory (5 m3 / hour) on manufacture of foam concrete, but there are no available assets. Whether barter is probable? For example the automobile of AUDI ?4 of 2001 of release
THE ANSWER:
Such variant is probable. Particularly to agree - come to us to office.

QUESTION:
I was interested with your offer on foam concrete, send a price on equipment, that there enters how to place, organize manufacture in a countryside, that it is necessary for this purpose.
THE ANSWER:
For reception of the price-list call back on a fax. As to manufacture in a countryside - you will need the warmed premise{room} from 200?2 the place for warehousing sand, cement, foamer, a supply of water is desirable with presence of a crane - beam. Think of access roads on your possible{probable} manufacture.

QUESTION:
It is possible to apply foamer for foam isol in manufacturing foam concrete? If yes, in what quantity{amount} you release{let off} also what price?
THE ANSWER:
We foamer is possible for applying and to foam concrete. The price of 3 c.u. for 1 kg. It is released{is let off} in 210 ? flanks, 1,1??/1????.


AERATED CONCRETE
FOAMISOL
FROTHER
POLYURETHANE FOAM
AERATED CONCRETE
FOAMISOL
POLYURETHANE FOAM
SLAG BLOCK
MACHINE TOOLS FOR ARE SHARP FOAM BLOCKS
Rent of installations on manufacture of materials :
Foam concrete
(up to 3 m 3 /hour)
80 c.u. for day of work
Foam isol
(up to 8 m 3 /hour)
50 for day of work

it is Necessary for c.u. presence of a liquid pledge for the sum of the rented equipment

To address by phone:




Advertising on our site

It is offered to the building organizations and the companies to place professional advertising on our site.

On questions of advertising address by phone:


News   |   Company   |   Strategy   |   FAQ   |   Price   |   Contact
© 2002-2008. SME «Continium»